Pipeline Construction
-
Pipeline installation stress management
- Stress analysis for various installation methods and different terrain conditions
- Confirmation of code compliance
- Design of hydrostatic testing
- Planning and execution of tie-in procedures
-
Lift and lowering-in stress management
- Correlate operational parameters (lift height, offset, number of sidebooms) with stresses in pipes
- Set windows of operational parameters to keep stress to acceptable levels
-
Assessment of new pipeline installation method and its impact on integrity
- Potential fatigue issues related to the use pneumatic hammer in HDD
- Stresses in microtunnelling
- Stresses during Direct Pipe installation
-
Management of potential damage from rocks in bedding and backfill materials and from falling rocks
- Dent and ovality acceptance criteria and allowance for engineering assessment (EA) in regulations and codes/standards
- Recommended EA methods
- Guidance on EA of dents and ovalities
- Case-specific analysis to justify or establish the limits of post-construction dents and ovalities
-
Linepipe specifications for improved tolerance to strains, including strain-based design
- Understanding denting threats of varying rock size
- Determination of minimum cover depth to protect pipes from damage by falling rocks
Example Projects – Pipeline Construction in Mountainous Areas
Representative Publications